fbpx
  • Background Image

    First Floor Additions

What should you expect to pay before your build can start?

To fund an addition or extension on your home, you may find yourself applying for a Construction Loan with your lender. This is all well and good, however, you may find that the lender will not formally approve and release funds until plans, Council approval and a Contract is in place outlining the progress stage payments of the build. So, to get to this point, how much should you expect to outlay? The short answer is that we find for most of our clients it’s around $20-$25K to complete the preliminary stage –  this is for preparation of all the documents required to start building.

Here at 32 Degrees Building we break it down into two manageable costs for our clients and below is an explanation of the preliminary process to help you as a client understand what happens before we can issue contracts and start your build:

Preliminary Phase 1: Design and development of your architectural plans

This is the start of your building journey with us. Here we coordinate a survey and engage the draftsperson to come out and meet with you. The draftsperson will talk you through your ideas, then design your initial concept plan to align to the quotation you have received. Usually, a few tweaks may be required and then you can sign off your concept plan and the full architectural drawings can be created ready for us to lodge for planning approval.

Preliminary Phase 2: Council Lodgement – Development Application & Construction Certificate OR Complying Development Consent

Once your plans are finalised (sitemap, elevations, shadow diagrams, floor plans etc..) the next step is where we will lodge your plans to Council or to a Private Certifier either as a Complying Development Consent OR as a Development Application and Construction Certificate

CDC or DA/CC fees will be advised once plans are developed and a Council fee quote can be provided. Here we obtain the additional relevant documentation needed in order for your build to be ready to start and this includes;

  • Statement of Environmental Effects – Details the potential environmental impacts the proposed build will have.
  • Waste Management Plan – Applies to all homes across Australia and explains how waste generated onsite will be managed, maintained and disposed of.
  • BASIX – The Building Sustainability Index applies to all residential homes across NSW and confirms the glazing and energy rating minimum that is required to comply to

  • Engineering plans and if a first floor addition a first floor certification to confirm your existing home will support the addition

  • Hydraulic plan and certification – This is to confirm your stormwater connections and how we will connect to the existing or if there are upgrade to the existing needed
  • Sydney Water check – To confirm that your build will not impact any of Sydney Waters assets
  • Sewer Service Diagram – We obtain this for the plumber to see where the existing connections to the home are
  • Long Service Levy – Applies to all residential works over $250K
  • There may be additional supporting documents required (e.g. Bushfire Report, Flood Report, Acoustic Report etc…)
  • and any other supporting documents as required

How long does this process take? Well, this all depends on the Council, the service providers and you as the client. We find that from planning to Council approval to issuing you with contracts can take around 3/4 months. Once your build cost and inclusions have been finalised and your HIA fixed price contract has been issued you can then provide these to your lender in order to finalise your finance approval.

If you haven’t built before or have no knowledge of the building and construction industry then preparing all of these documents can seem quite daunting. That’s why with us, you would have us as your main point of contact to do all of the hard work for you. We even liaise between yourself and the draftsperson to help you stay within your budget when developing your plans and address any of the questions you have about the build along the way.

To get started on your building journey with us, we ask you to download our packages or complete our pre-quote enquiry form and tell us what you would like to build, from there one of our team members will be in touch with you.





2016 HIA-CSR NSW Housing Award Finalists

2016 HIA-CSR NSW Housing Award Finalists

HIA Professional Builder Award

&

Renovations & Additions $200K – $600K Award

We’ve done it again! This year, we have we been successfully nominated as a finalist in the HIA Professional Builders Award and alongside that we have also, for the second year in a row, been selected as a finalist in the HIA-CSR NSW Housing Awards in the extensions $200,001- $600,000 Category with our Camden first floor addition and extension

Alistair, Director and Licenced Builder on becoming finalist as a professional builder – “It’s an honour for all of us at 32 Degrees Building to be recognised as a professional builder based upon our values and commitment to our clients and the customer service we strive to deliver. This, combined with our continuous improvement strategies and our financial management processes have resulted in our achievements as a builder to date.”

Our first floor addition and ground floor extension is a beautiful 1950’s home situated within walking distance of the centre of Camden. Originally only 103m2 the addition and full renovation added over 258m2 to their home giving the owners plenty of additional living space, including 3 bedrooms, two bathrooms, media room, alfresco and also a commercial kitchen to meet the needs of the owners growing hospitality business, Cupcakes in Camden.

“Alistair first said….” oh don’t worry a few months after you won’t even believe you’ve been through it!” You were right!….I still pinch myself that this beautiful new space is ours. We had never done anything like this before but I THANK YOU for making the whole process smooth, enjoyable and fun….I really learnt so much! Wishing 32 Degrees all the best for Sat night! with the HIA Awards. We are honoured to be a finalist and believe you guys are so deserving of a big Win so fingers crossed.”

Best Wishes, Nicci, Steve, Livi and Bailey!”

The winner is to be announced at the upcoming HIA-CSR NSW Housing Awards night on the 15th October and we will keep you updated via our website and social media pages!

About 32 Degrees Building

Building in a bushfire prone area

We recently completed an extension and deck in Orangeville that was in a bushfire prone area and had to comply with BAL-FZ requirements. For those of you that are unfamiliar with being in a bushfire prone area, BAL-FZ means that the home has been classed as being located in direct flame zone and that there is an extreme risk to life and loss of the home should a bushfire occur.

Bushfire ratings are as follows;

  • BAL-Low (Very Low Risk)
  • BAL-12.5 (Low Risk)
  • BAL-19 (Moderate Risk)
  • BAL-29 (High Risk)
  • BAL-40 (Very High Risk)
  • BAL-FZ (Extreme Risk)

The BAL rating may determine the types of materials you are able to use or, additional materials that are required when building or extending your home (eg. bushfire shutters).

Bushfire Shutters at our BAL-FZ First Floor Addition in Lane Cove North (Click photo for full gallery)

Bushfire Shutters at our BAL-FZ First Floor Addition in Lane Cove North (Click photo for full gallery)

What measures should you take?

If your property backs onto bushland or even a Council nature strip you will have to obtain a BAL Risk Assessment Certificate from a qualified consultant to determine your Bushfire Attack Level. The report will outline the BAL rating on each elevation (yes, your BAL rating can be different on each side of your home) and advise you of the measures you need to take to maximise the safety of your family and your home and ensure you stay protected.

Building in a bushfire prone area: flamezone

The home in Orangeville was classed as BAL-FZ as it was in a location where it was deemed an extreme risk to bushfire so there were a few requirements that we had to ensure that we undertook when building this extension to comply with the RFS and Council requirements;

  • The deck was constructed with a cement based product with no gaps between the boards for embers to get into
  • The subfloor brickwork still has to have ventilation, and so a metal gauze with no more than a 2mm aperture was used to cover the weep holes and stop embers from getting in under the home.
  • The cladding we used was a minimum of 6mm thick with no gaps between the boards.
  • The windows were made with 6mm toughened glass and aluminium frames
  • Bushfire shutters were installed – you can have either manual or automatic
  • The roof and deck frames were made of steel
  • For the eaves we used firecheq plasterboard  and importantly we ensured that all gaps and holes were sealed to stop potential embers getting into

If you are in a bushfire prone area and thinking of building an extension or addition, speak to us, we are able to provide you with advice and guide you in the right direction.

Watch our video

Watch Alistair, the builder out at the deck extension in Orangeville talking about how we met the BAL-FZ requirements.